Victoria Dam, a concrete hydroelectric dam in Sri Lanka.

Data driven insights for a greener Sri Lanka

Energy & Renewable Energy Intelligence

Installed generation capacity at the end of 2024, including estimated rooftop solar. A second official total, 4,648 MW, excludes most rooftop solar and is not mixed into these cards.

Popular searches HydroSolarWind

Installed capacity

6,048 MW

Parliament of Sri Lanka, citing Ceylon Electricity Board generation mix · 2024 · MW

Major hydro

1,533 MW

Parliament of Sri Lanka, citing Ceylon Electricity Board generation mix · 2024 · MW

Rooftop solar, estimated

1,416 MW

Parliament of Sri Lanka, citing Ceylon Electricity Board generation mix · 2024 · MW

Wind, CEB and IPP

267 MW

Parliament of Sri Lanka, citing Ceylon Electricity Board generation mix · 2024 · MW

Business discovery

A national register, once a licensed source is loaded.

Industry intelligence

Published economic figures, each with a source and period.

Geographic intelligence

Provinces, districts and, later, DS and GN divisions.

Opportunity intelligence

Only projects named in a public document.

Predictive intelligence

Not in this release. No model output is shown.

Activity by district

Data coming soon

No official district breakdown for this sector was loaded. The national figures above are the ones that were published.

Jaffna, Northern ProvinceKilinochchi, Northern ProvinceMannar, Northern ProvinceMullaittivu, Northern ProvinceVavuniya, Northern ProvinceGalle, Southern ProvinceHambantota, Southern ProvinceMatara, Southern ProvinceAmpara, Eastern ProvinceAnuradhapura, North Central ProvinceBadulla, Uva ProvinceBatticaloa, Eastern ProvinceMonaragala, Uva ProvincePolonnaruwa, North Central ProvinceColombo, Western ProvinceGampaha, Western ProvinceKalutara, Western ProvinceKegalla, Sabaragamuwa ProvinceKurunegala, North Western ProvincePuttalam, North Western ProvinceRatnapura, Sabaragamuwa ProvinceKandy, Central ProvinceMatale, Central ProvinceNuwara Eliya, Central ProvinceTrincomalee, Eastern Province
District shapes. Simplified display geometry, not a legal boundary. Map credits

Key insights

Installed capacity is a single end-2024 total

Parliament of Sri Lanka, citing Ceylon Electricity Board generation mix · 2024 · MW. Each bar is a published figure, not an index.

2024: 6,048 MW.

Featured opportunities

Data coming soon

No checked project listing

A featured card is shown only when a government publication names the project. None has been checked for this view.

Colombo skyline, with tower cranes on buildings under construction.

Are you a business owner?

  • Claiming is not open in this preview.
  • A claim will be reviewed before a record can be marked business-claimed.
  • That status stays separate from source-verified.
Claim Your Business