නිදර්ශක ඡායාරූපය: ශ්‍රී ලාංකීය වරායක ධීවර යාත්‍රා
Announced Construction Public works contract

Galle Port Development Project: 45 ha reclamation in the Bay of Galle

Dewata Beach, Bay of Galle

සමාලෝචනය කළා · 30 Oct 2026 දෝෂයක් වාර්තා කරන්න

The Sri Lanka Ports Authority plans to reclaim about 45 hectares along Dewata Beach in the Bay of Galle for tourism and real-estate uses beside a new 150 m cruise berth and terminal. The supplementary environmental impact assessment (October 2024) is on public notice with Coast Conservation.

ලේඛනවල ප්‍රධාන කරුණු

  • Reclamation estimated at 44.97 ha, needing about 1.92 million m³ of fill from harbour dredging and approved sand sites.
  • The wider project adds berthing for cruise ships, super-yachts and small boats, and water-sports facilities.
  • Reclamation is to be done by specialised dredging and reclamation contractors appointed by the SLPA.
  • The assessment was prepared by the Central Engineering Consultancy Bureau; Coast Conservation is the approving agency.

තවදුරටත් ඉදිරියට යාමට

Watch SLPA procurement notices for dredging, reclamation and marine works; contractors need a CIDA dredging & reclamation or maritime grade.

ඇගයීම

අවස්ථා වර්ගය Public works contract
සූදානම් ලකුණු 70/ 100
විශ්වාසය Medium confidence 5 චෙක්පත් වලින් 3ක් හමු විය
අවදානම Not yet assessed

පක්ෂ සාධක

  • Proponent, approving agency, reclamation extent and fill volume, cruise berth and planned uses. ලේඛනය 1

විරුද්ධ සාධක

අවදානම්

තවම තක්සේරු කර නැත

නොදන්නා කරුණු

  • මූලාශ්‍රවල අවසන් දිනයක් දක්වා නොමැත. ලේඛනය 1
ලකුණු සහ විශ්වාසය සැකසූ ආකාරය
  • Status: 40 න් 20
  • Way to take part stated: 15 න් 15
  • Dates in the sources: 15 න් 15
  • Division named: 10 න් 10
  • Confidence: 20 න් 10
  • ඔව්: නිල ප්‍රකාශකයෙකුගෙන් ප්‍රධාන ලේඛනය
  • නැත: ප්‍රධාන ලේඛනය අපගේ පරීක්ෂාවට දින 180කට වඩා පැරණි නැත
  • නැත: ලේඛන කිහිපයක්
  • ඔව්: ප්‍රධාන ලේඛනයේ checksum එක තබා ඇත
  • ඔව්: පසුගිය දින 30 තුළ පරීක්ෂා කළ

සම්පූර්ණ ක්‍රමය කියවන්න

සාක්ෂි

The document මෙම වාර්තාව රඳා පවතී. අපගේ වචනවලින් කරුණු නැවත සඳහන් කර ඇත; ලේඛන සම්බන්ධ කර ඇත, පිටපත් කර නැත.

  1. ප්‍රාථමික මූලාශ්‍රය Statutory body or authority

    Supplementary EIA report for proposed reclamation under the Galle Port Development Project (final report, October 2024)

    Coast Conservation and Coastal Resources Management Department

    ලේඛනයේ දිනය
    8 Nov 2024
    ලබාගත්තේ
    30 Oct 2026
    බැලිය යුතු තැන්
    Executive summary and chapter 2. The cover says October 2024; 8 Nov 2024 is the date the PDF was last saved.
    සහාය දක්වයි
    Proponent, approving agency, reclamation extent and fill volume, cruise berth and planned uses.
    ගොනුවේ SHA-256
    0d90d8a6cb566ee7…
    coastal.gov.lk මත ලේඛනය විවෘත කරන්න

Galle තුළ තවත්

සියලු අවස්ථා
නිදර්ශක ඡායාරූපය: ඉදිකිරීම් බිමක පස් කපන යන්ත්‍ර
ඉදිකිරීම් විවෘතයි

ABC metal supply and laying for rural roads, Hiniduma division (RDA)

RDA's Executive Engineer's office at Thalgaswala is inviting bids to supply, and separately to supply and lay, ABC metal for the rural roads programme in the Hiniduma division of Galle District. Bids close on 11 November 2026.

Hiniduma engineering division, Galle District අවසන් දිනය 11 නොවැම්බර් 2026 Road Development Authority
නිදර්ශක ඡායාරූපය: විදුලි කණු සහ රැහැන්

CEB's Southern Province 1 office in Galle is taking e-quotations on PROMISe for 200 reinforced-concrete 6 m poles, 25,000 m of aerial bundled conductor and 30 line-change cross-arm sets. The first two close on 4 November 2026, the cross-arms on 11 November.

CEB Southern Province 1, Galle අවසන් දිනය 11 නොවැම්බර් 2026 e-GP Sri Lanka (PROMISe)
නිදර්ශක ඡායාරූපය: ඉදිකිරීම් බිමක පස් කපන යන්ත්‍ර
ඉදිකිරීම් විවෘතයි

Ready-mix concrete supply for rural roads, Matara and Deniyaya (RDA)

RDA's Chief Engineer's office in Matara is inviting bids to supply grade 30 ready-mix concrete for rural road and special projects in the Matara and Deniyaya engineering divisions. Bids close on 11 November 2026.

Matara and Deniyaya engineering divisions අවසන් දිනය 11 නොවැම්බර් 2026 Road Development Authority