A National Water Supply and Drainage Board scheme drawing on the Nilwala river to serve 12 divisional secretariat areas in Matara and part of Hambantota. Its design-and-build contract was ended by mutual agreement in January 2023 at 93.4% progress, so the remaining works are still to be completed.
ලේඛනවල ප්රධාන කරුණු
- Intake 66,000 m³/day; treatment plant 33,000 m³/day in this stage; about 78 km of transmission and 200 km of distribution mains.
- Planned to reach a further 285,000 people by 2046 on top of the 284,808 served by the Matara–Mirissa scheme.
- Contract with Kolon–Samsung C&T JV started on 11 October 2017; funded by a Rs. 35 bn NDB loan and Rs. 4 bn from the government.
- The NWSDB project page records the mutual termination on 31 January 2023 after budget shortfalls.
තවදුරටත් ඉදිරියට යාමට
Watch NWSDB tender notices for a contract to finish the remaining works.
ඇගයීම
පක්ෂ සාධක
- Scope, capacities, coverage, contractor, funding, start date and the 2023 termination at 93.4%. ලේඛනය 1
විරුද්ධ සාධක
- Announced only: no call for bids or proposals has been seen yet. ලේඛනය 1
අවදානම්
තවම තක්සේරු කර නැත
නොදන්නා කරුණු
- මූලාශ්රවල අවසන් දිනයක් දක්වා නොමැත. ලේඛනය 1
ලකුණු සහ විශ්වාසය සැකසූ ආකාරය
- Status: 40 න් 20
- Way to take part stated: 15 න් 15
- Dates in the sources: 15 න් 15
- Division named: 10 න් 10
- Confidence: 20 න් 20
- ඔව්: නිල ප්රකාශකයෙකුගෙන් ප්රධාන ලේඛනය
- ඔව්: ප්රධාන ලේඛනය අපගේ පරීක්ෂාවට දින 180කට වඩා පැරණි නැත
- නැත: ලේඛන කිහිපයක්
- ඔව්: ප්රධාන ලේඛනයේ checksum එක තබා ඇත
- ඔව්: පසුගිය දින 30 තුළ පරීක්ෂා කළ
සාක්ෂි
The document මෙම වාර්තාව රඳා පවතී. අපගේ වචනවලින් කරුණු නැවත සඳහන් කර ඇත; ලේඛන සම්බන්ධ කර ඇත, පිටපත් කර නැත.
- ප්රාථමික මූලාශ්රය Statutory body or authority
Our projects: Matara Stage IV Water Supply Project
National Water Supply and Drainage Board
waterboard.lk මත ලේඛනය විවෘත කරන්න